Grid Interconnection

Description

Includes references for Interconnecting Energy Storage Systems with power grids

Distributed Generation Application Guideline, 2013

Identifier
Distributed Generation Application Guideline, 2013
Title
Distributed Generation Application Guideline, 2013
Type of Document
Guidance Document
Edition Date
2013-01-01
Summary

This guideline is primarily intended to provide an overview of the application process involved in becoming a distributed generator. If a prospective power plant owner plans to generate electric energy and the power plant capacity rating is less than one MW, the applicant may proceed without filing an application with the Alberta Utilities Commission (AUC) if the following three requirements are met: ? No person is directly and adversely affected. ? The power plant complies with AUC Rule 012: Noise Control (AUC Rule 012). ? There is no effect on the environment.

ES Main Coverage
Site, Building and Enclosure Coverage

ECG0008

Identifier
ECG0008
Title
Distributed System Voltage and Power Quality
Type of Document
Guidance Document
Edition Date
2016-03-09
Summary

The scope of this document is to provide guidelines for consistant and standard applications for voltage and power quality requirements on or connected to HOL’s distribution system. Normally voltage limits, voltage distortion, and current distortion are measured at the customer’s Point of Supply as per HOL document ECS0012. This document does not cover the following power quality issues: • Voltage control when the Independent Electrical System Operator (IESO) has declared a voltage reduction or an electrical system emergency; • Non-standard conditions such as a force majeure (e.g.

ECG0006

Identifier
ECG0006
Title
Embedded Generation Connection Guideline
Type of Document
Guidance Document
Edition Date
2005-02-02
Summary

This guideline is intended to assist the customer in understanding the connection process that results in connection of the customer's generation facility to Hydro Ottwwa's distribution network. This guideline does not provide all the details of costs or responsibilities that the customer may assume; such details will be evaluated for each specific request.