- Location and weather condition of battery site should be considered to minimize requirements for battery storage structure
- Site location should be as close as possible to the distribution loads; currently any fault between battery site and town of Field (4 km) would disable the battery islanding function
- Possible permitting delays due to the site location
- Possible delays due to environmental assessment
- Stakeholder engagement may affect schedule