Distributed Generation Application Guideline, 2013
This guideline is primarily intended to provide an overview of the application process involved in becoming a distributed generator. If a prospective power plant owner plans to generate electric energy and the power plant capacity rating is less than one MW, the applicant may proceed without filing an application with the Alberta Utilities Commission (AUC) if the following three requirements are met: ? No person is directly and adversely affected. ? The power plant complies with AUC Rule 012: Noise Control (AUC Rule 012). ? There is no effect on the environment.