Commissioning
PTC 19.10 - 1981
This Document specifies methods, apparatus, and calculations which are used in conjunction with Performance Test Codes to determine quantitatively, the gaseous constituents of exhausts resulting from stationary combustion sources. The gases covered by this Document are oxygen, carbon dioxide, carbon monoxide, nitrogen, sulfur dioxide, sulfur trioxide, nitric oxide, nitrogen dioxide, hydrogen sulfide, and hydrocarbons.
PTC 38
BS EN ISO 20485:2018
This document describes the techniques to be applied for the detection of a leak, using a tracer gas and a tracer gas specific leak detector.
PN 1479
IEC TS 62933-3-1 ED1
This work item proposal deals with the planning and installation of EES systems and should be elaborated in close cooperation with unit parameter and tes
PNNL-22010 Rev. 2 / SAND2016-3078 R
The Protocol for Uniformly Measuring and Expressing the Performance of Energy Storage Systems
(PNNL-22010) was first issued in November 2012 as a first step toward providing a foundational basis
for developing an initial standard for the uniform measurement and expression of energy storage system
(ESS) performance. Based on experiences with the application and use of that document, and to include
additional ESS applications and associated duty cycles, test procedures and performance metrics, a first
revision of the November 2012 Protocol was issued in June 2014 (PNNL-22010 Rev. 1). As an update of
the 2014 revision 1 to the Protocol, this document (the April 2016 revision 2 to the Protocol) is intended
to supersede the June 2014 revision 1 to the Protocol and provide a more user-friendly yet more robust
and comprehensive basis for measuring and expressing ESS performance. This foreword1 provides
general and specific details about what additions, revisions, and enhancements have been made to the
June 2014 Protocol and the rationale for them in arriving at this April 2016 Protocol (PNNL-22010 Rev.
2 / SAND2016-3078 R).em in arriving at the June 2014 Protocol.
IEC TS 62257-6:2015
IEC TS 62257-6:2015(E) describes the various rules to be applied for acceptance, operation, maintenance and replacement of decentralized rural electrification systems which are designed to supply electric power for sites which are not connected to a large interconnected system, or a national grid, in order to meet basic needs. This technical specification proposes a methodology to achieve the best technical and economic conditions for acceptance, operation, maintenance and replacement of equipment and complete system life cycle.