Design and Planning Requirements

Description of the issue

Design & Planning:

  • Modular container design meant restricted space in switchgear container, investigate a purpose built prefab 16’ building
  • All engine controls need to be a common 24 volts
  • Putting equipment on the roof is not a good idea. The operator needs to inspect service motors and connections on a daily basis
  • Remote access is must-have. Need to be able to troubleshoot and update software remotely

 

Recommandations

Implementation:

  • The communication with the community was very good – frequent updates a necessity
  • GPS on transport trucks to detect speeds etc. Language in contracts about excessive speeds and damage to equipment on winter roads
  • Regular scheduled meeting should be held with all stakeholders rather than immediate parties
  • Site security-community using worksite as thoroughfare
  • Equipment maintenance logs and certificates of competency required as part of H&S documentation but in a small remote community it may not be available
  • Shipping and logistics were very difficult at times – it is an issue in most small communities