Requirements

IEC TS 62257-2:2015

Identifier
IEC TS 62257-2:2015
Title
Recommendations for renewable energy and hybrid systems for rural electrification - Part 2: From requirements to a range of electrification systems
Type of Document
Technical Specification
Publisher
Edition Date
2015 Dec 11
Summary

IEC TS 62257-2:2015(E) proposes a methodological approach for the setting up and carrying out of socio-economic studies as part of the framework of decentralized rural electrification projects. It is addressed to project teams and in particular to experts in charge of socio-economic studies in international projects. This technical specification also provides some structures as technical solutions that could be recommended, depending on the qualitative and quantitative energy demands, consistent with the needs and financial situation of the customers.

ES Main Coverage
Project Stage

ES55 Q4-07

Identifier
ES55 Q4-07
Title
Medium-Voltage Customer Emission Limits - Voltage Unbalanced
Type of Document
Standard
Edition Date
2016 Dec 20
Summary

Scope:
This standard defines the method for determining load unbalance emission limits for customers connecting to, or requesting connection to BC Hydro's public medium-voltage (MV) distribution network. It also describes the assessment process for verifying compliance with prescribed load unbalance emission limits.
Application:
Q4 is intended for application by distribution planning engineers, regionalengineers, designers and power quality engineers for:

ES Main Coverage
Site, Building and Enclosure Coverage

IMO REQ 0041

Identifier
IMO REQ 0041
Title
Ontario Resource and Transmission Assessment Criteria
Type of Document
Requirements
Edition Date
2007 Aug 22
Summary

1.1 Purpose
The purpose of this document is to identify the technical criteria for use in the assessments of the adequacy and security of the IESO-controlled grid and to clarify how the IESO will apply the relevant NPCC and NERC standards and implement them within Ontario.
1.2 Scope

ES Main Coverage
Site, Building and Enclosure Coverage
Project Stage