IEC

IEC 62040-3:2011

Identifier
IEC 62040-3:2011
Title
Uninterruptible power systems (UPS) - Part 3: Method of specifying the performance and test requirements
Type of Document
Standard
Publisher
Edition Date
2011 Mar 01
Summary

IEC 62040-3:2011 applies to movable, stationary and fixed electronic uninterruptible power systems (UPS) that deliver single or three phase fixed frequency a.c. output voltage not exceeding 1 000 V a.c. and that incorporate an energy storage system, generally connected through a d.c. link. This standard is intended to specify performance and test requirements of a complete UPS and not of individual UPS functional units. The individual UPS functional units are dealt with in IEC publications referred to in the bibliography that apply so far that they are not in contradiction with this standard. The primary function of the UPS covered by this standard is to ensure continuity of an a.c. power source. The UPS may also serve to improve the quality of the power source by keeping it within specified characteristics. UPS have been developed over a wide range of power, from less than hundred watts to several megawatts, to meet requirements for availability and quality of power to a variety of loads. Refer to Annexes A and B for information on typical UPS configurations and topologies. This standard also covers UPS test and performance when power switches form integral part of a UPS and are associated with its output. Included are interrupters, bypass switches, isolating switches, and tie switches. These switches interact with other functional units of the UPS to maintain continuity of load power. This standard does not cover:
- conventional a.c. input and output distribution boards or d.c. boards and their associated switches (e.g. switches for batteries, rectifier output or inverter input);
- stand-alone static transfer systems covered by IEC 62310-3;
- systems wherein the output voltage is derived from a rotating machine.
NOTE 1 This standard recognises that power availability to information technology (IT) equipment represents a major UPS application. The UPS output characteristics specified in this standard are therefore also aimed at ensuring compatibility with the requirements of IT equipment. This, subject any limitation stated in the manufacturer's declaration, includes requirements for steady state and transient voltage variation as well as for the supply of both linear and non-linear load characteristics of IT equipment.
NOTE 2 Test loads specified in this standard simulate both linear and non-linear load characteristics. Their use is prescribed with the objective of verifying design and performance, as declared by the manufacturer, and also of minimising any complexity and energy consumption during the tests.
NOTE 3 This standard is aimed at 50 Hz and 60 Hz applications but does not exclude other frequency applications within the domain of IEC 60196. This is subject to an agreement between manufacturer and purchase in respect to any particular requirements arising.
NOTE 4 Single phase and three-phase voltage UPS covered by this standard include without limitation UPS supplying single-phase, two-wire; single-phase, three-wire; two-phase, three-wire, three-phase, three-wire and three-phase, four-wire loads.
This second edition cancels and replaces first edition published in 1999 and constitutes a technical revision. The significant technical changes are:
- reference test load - definition and application revised (3.3.5 and 6.1.1.3);
- test schedule - presented as a single table grouped by revised type and routine tests (see 6.1.6, Table 3);
- dynamic output voltage performance characteristics - guidance to measure - addition (Annex H);
- UPS efficiency - requirements and methods of measure - addition (Annexes I and J);
- functional availability - guidance for UPS reliability integrity level classification - addition (Annex K).

Type of ES Technology
ES Main Coverage

IEC TR 62746-2:2015

Identifier
IEC TR 62746-2:2015
Title
Systems interface between customer energy management system and the power management system - Part 2: Use cases and requirements
Type of Document
Report
Publisher
Edition Date
2015 Apr 22
Summary

IEC TR 62746-2:2015(EN) describes the main pillars of interoperability to assist different Technical Committees in defining their interfaces and messages covering the whole chain between a smart grid and smart home/building/industrial area.

ES Main Coverage
Project Stage

IEC TR 61850-90-3:2016

Identifier
IEC TR 61850-90-3:2016
Title
Communication networks and systems for power utility automation - Part 90-3: Using IEC 61850 for condition monitoring diagnosis and analysis
Type of Document
Report
Publisher
Edition Date
2016 May 12
Summary

IEC TR 61850-90-3:2016(E) addresses communication aspects related to specific sensor networks that are widely used as well as information exchange towards asset management systems. Since the outcome of this work will affect several parts of IEC 61850, in a first step, this technical report has been prepared to address the topic from an application specific viewpoint across all affected parts of IEC 61850. Once this technical report has been approved, the affected parts of the standard will be amended with the results from the report.

ES Main Coverage
Project Stage

IEC 61131-6:2012

Identifier
IEC 61131-6:2012
Title
Programmable controllers - Part 6: Functional safety
Type of Document
Standard
Publisher
Edition Date
2012 Oct 02
Summary

IEC 61131-6:2012 specifies requirements for programmable controllers (PLCs) and their associated peripherals, as defined in Part 1, which are intended to be used as the logic subsystem of an electrical/electronic/programmable electronic (E/E/PE) safety-related system. A programmable controller and its associated peripherals complying with the requirements of this part is considered suitable for use in an E/E/PE safety-related system and is identified as a functional safety programmable logic controller (FS-PLC). An FS-PLC is generally a hardware (HW) / software (SW) subsystem.

ES Main Coverage
Project Stage

IEC 61850-5:2013

Identifier
IEC 61850-5:2013
Title
Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models
Type of Document
Standard
Publisher
Edition Date
2013 Jan 30
Summary

IEC 61850-5:2013 applies to power utility automation systems with the core part of substation automation systems (SAS); it standardizes the communication between intelligent electronic devices (IEDs) and defines the related system requirements to be supported. The major technical changes with regard to the previous edition are as follows:
- extension from substation automation systems to utility automation systems;
- inclusion of interfaces for communication between substations;
- requirements from communication beyond the boundary of the substation.

ES Main Coverage
Project Stage

IEC/IEEE 61850-9-3:2016

Identifier
IEC/IEEE 61850-9-3:2016
Title
Communication networks and systems for power utility automation - Part 9-3: Precision time protocol profile for power utility automation
Type of Document
Standard
Publisher
Edition Date
2016 May 31
Summary

IEC/IEEE 61850-9-3:2016(E) specifies a precision time protocol (PTP) profile of IEC 61588:2009 / IEEE Std 1588-2008 applicable to power utility automation, which allows compliance with the highest synchronization classes of IEC 61850-5 and IEC 61869-9.

ES Main Coverage
Project Stage

IEC TR 61850-90-1:2010

Identifier
IEC TR 61850-90-1:2010
Title
Communication networks and systems for power utility automation - Part 90-1: Use of IEC 61850 for the communication between substations
Type of Document
Report
Publisher
Edition Date
2010 Mar 16
Summary

IEC/TR 61850-90-1:2010(E) provides a comprehensive overview on the different aspects that need to be considered while using IEC 61850 for information exchange between substations. In particular, this technical report defines use cases that:
- require an information exchange between substations;
- describes the communication requirements;
- gives guidelines for the communication services and communication architecture to be used;
- defines data as a prerequisite for interoperable applications;

ES Main Coverage
Project Stage

IEC TR 61850-90-2:2016

Identifier
IEC TR 61850-90-2:2016
Title
Communication networks and systems for power utility automation - Part 90-2: Using IEC 61850 for communication between substations and control centres
Type of Document
Report
Publisher
Edition Date
2016 Feb 25
Summary

IEC TR 61850-90-2:2016(E) provides a comprehensive overview of the different aspects that need to be considered while using IEC 61850 for information exchange between substations and control or maintenance centres or other system level applications. In particular, this technical report:
- defines use cases and communication requirements that require an information exchange between substations and control or maintenance centres;
- describes the usage of the configuration language of IEC 61850-6;

ES Main Coverage
Project Stage

IEC 61131-5:2000

Identifier
IEC 61131-5:2000
Title
Programmable controllers - Part 5: Communications
Type of Document
Standard
Publisher
Edition Date
2000 Nov 15
Summary

IEC 61131-5:2000 specifies communication aspects of a programmable controller. It specifies from the viewpoint of a PC how any device can communicate with a PC as a server and how a PC can communicate with any device. In particular, it specifies the behavior of the PC as it provides services on behalf of other devices and the services the PC application program can request from other devices. This bilingual version (2012-08) corresponds to the monolingual English version, published in 2000-11.
This publication is to be read in conjunction with the IEC 61131 series.

ES Main Coverage
Project Stage

IEC TR 61850-90-5:2012

Identifier
IEC TR 61850-90-5:2012
Title
Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118
Type of Document
Report
Publisher
Edition Date
2012 May 09
Summary

IEC/TR 61850-90-5:2012(E) provides a way of exchanging synchrophasor data between PMUs, PDCs WAMPAC (Wide Area Monitoring, Protection, and Control), and between control center applications. The data, to the extent covered in IEEE C37.118-2005, are transported in a way that is compliant to the concepts of IEC 61850. However, given the primary scope and use cases, this document also provides routable profiles for IEC 61850-8-1 GOOSE and IEC 61850-9-2 SV packets. These routable packets can be utilized to transport general IEC 61850 data as well as synchrophasor data.

ES Main Coverage
Project Stage