ES Project
Description of the issue
Within Yoho National Park;
Approximately 4 km from the Town of Field;
Location due to available land
Recommandations
Site location should be as close as possible to the distribution loads; currently any fault between battery site and town of Field (4 km) would disable the battery islanding function
Project Stage
Site, Building and Enclosure