IEC
IEC 61850-7-420
IEC 61850-7-420:2009(E) defines IEC 61850 information models to be used in the exchange of information with distributed energy resources (DER), which comprise dispersed generation devices and dispersed storage devices, including reciprocating engines, fuel cells, microturbines, photovoltaics, combined heat and power, and energy storage. Utilizes existing IEC 61850-7-4 logical nodes where possible, but also defines DER-specific logical nodes where needed.
IEC 60870-5-1:1990
Covers asynchronous data transmission with half duplex and duplex link protocols operating with window size one for message transfers. Specifies the basic requirements for services to be provided by the link plus physical layers, for telecontrol applications. In particular it specifies standards on coding, formatting and synchronizing data frames of variable and filed lengths which meet specified data integrity requirements.
This publication is of high relevance for Smart Grid.
IEC 60870-5-2:1992
Applies to telecontrol equipment and systems with coded bit serial data transmission for monitoring and controlling geographically widespread processes.
This publication is of high relevance for Smart Grid.
IEC 60870-5-3:1992
Applies to telecontrol equipment and systems with coded bit serial data transmission for monitoring and controlling geographically widespread processes; specifies rules for structuring application data units in transmission frames of telecontrol systems.
This publication is of high relevance for Smart Grid.
IEC 60870-5-4:1993
Gives rules for defining information elements and presents a set of information elements, in particular of digital and analog process variables frequently used in telecontrol applications.
This publication is of high relevance for Smart Grid.
IEC 60870-5-5:1995
Applies to telecontrol equipment and systems with coded bit serial data transmission for monitoring and controlling geographically widespread processes. It defines a telecontrol companion standard that enables interoperability among compatible telecontrol equipment.
This publication is of high relevance for Smart Grid.
IEC 60870-5-6:2006
IEC 60870-5-6:2006 Specifies methods for conformance testing of telecontrol equipment, amongst substation automation systems and telecontrol systems, including front-end functions of SCADA. Facilitates interoperability by providing a standard method of testing protocol implementations. Is expected to minimize the risk of non-interoperability.
IEC TS 60870-5-7:2013
IEC/TS 60870-5-7:2013(E) describes messages and data formats for implementing IEC/TS 62351-5 for secure authentication as an extension to IEC 60870-5-101 and IEC 60870-5-104. The purpose of this base standard is to permit the receiver of any IEC 60870-5-101/104 Application Protocol Data Unit (APDU) to verify that the APDU was transmitted by an authorized user and that the APDU was not modified in transit. It provides methods to authenticate not only the device which originated the APDU but also the individual human user if that capability is supported by the rest of the telecontrol system.
IEC 60870-5-101:2003+AMD1:2015 CSV
IEC 60870-5-101:2003+A1:2015 Applies to telecontrol equipment and systems with coded bit serial data transmission for monitoring and controlling geographically widespread processes. Defines a telecontrol companion standard that enables interoperability among compatible telecontrol equipment. The defined telecontrol companion standard utilizes standards of the IEC 60870-5 series of documents.